AH-64D PPC PDF

Home  /   AH-64D PPC PDF

The Flight Performance Models (FPMs) embedded in the PPC application are based on flight test data and the performance charts in the AHD Operator’s. This manual provides specific guidelines for executing AHD aircrew Performance planning card (PPC) DA Form R (UH/AH Get the da form 64 r. Description of ah 64d ppc pdf. DEPARTURE PA FAT LOAD TAKEOFF GWT lb SINGLE ENG DUAL ENG FUEL MSN ATF ETF TR MAX .

Author: Tezilkree Nisida
Country: Saudi Arabia
Language: English (Spanish)
Genre: Environment
Published (Last): 22 October 2014
Pages: 139
PDF File Size: 20.17 Mb
ePub File Size: 11.29 Mb
ISBN: 936-7-13680-896-8
Downloads: 50980
Price: Free* [*Free Regsitration Required]
Uploader: Fauk

We adapted to this environment well, but were fortunate to have a wealth of experienced aviators in our company.

During the deployment, we were exposed to a wide range of temperatures, a variety of flight environments, and altitude extremes that we had never operated in before. By the end of April, the temperature at Kandahar was nearing degrees Fahrenheit. We knew that it would not be long before power was a luxury that we ag-64d not have.

  ANTROPOLOGIA CULTURAL KOTTAK PDF

AHD Block 2 PPC Book – Study Material

We had already conducted numerous missions to include Operation Anaconda. Our first mission took ppcc from Kandahar to Bagram Airbase to refuel and then on to the eastern city of Khowst.

This cell always contained at least one of the unit instructor pilots. We arrived in Afghanistan near the end of January and were based out of Kandahar International Airport.

AH-64D Apache (Longbow)

A valuable lesson learned from this deployment is that units should focus early on power management issues and train accordingly so that they are prepared when deployed.

Kandahar is approximately 3, feet mean sea level MSL and can be characterized as high desert. Each mission required performance planning for altitudes, temperatures, and gross weights that were much higher than we normally operate. We quickly learned that power management was a skill necessary to survive our deployment.

ah-46d Within three weeks of our arrival, our missions started taking us to higher and higher altitudes. On a daily basis, we had power available to hover out of ground effect OGE. While en route to Khowst, we crossed a snow-covered mountain at 11, MSL.

  FUTURO PASSADO KOSELLECK PDF

The terrain is relatively flat with rolling sand dunes 10 miles west and a mountain range approximately 15 miles to the north. The racetrack patterns and running fire tactics we utilized were necessary due to insufficient power to hover and to increase our own survivability.

AH-64 Apache Operations In Afghanistan

During the winter months at Kandahar, our aircraft performed well. During our missions in Afghanistan, we had two aviators assigned to our performance-planning cell. Performance planning was a critical part of each mission. I slowly increased the power until I drooped the rotor and then decreased the collective.