Appendix A – M24 Fluokit Disposal Procedures. Fluokit Indoor Ring Main Units contain Sulphur Hexafluoride (SF6) gas as an insulating medium which is. AIR INSULATED SWITCHGEAR. FLUOKIT M+ MV modular switchgear up to 24kV. Technical Specifications. AREVA T&D. Summary. Cubicle equipment. FLUOKIT M+ cubicles include the following features: Operating Cubicles in the FLUOKIT M+ range all have functional . Fluokit M24 & M24+ meets your.

Author: Sajinn Mulrajas
Country: Rwanda
Language: English (Spanish)
Genre: Technology
Published (Last): 16 August 2013
Pages: 286
PDF File Size: 6.41 Mb
ePub File Size: 16.10 Mb
ISBN: 917-3-73251-181-5
Downloads: 36995
Price: Free* [*Free Regsitration Required]
Uploader: Vurr

It’s a community-based project which helps to repair anything. The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders.

The room must be equipped with standardised high level and low level ventilation. Schneider Electric request the carefully reading of the following instructions in order to familiarize yourself with the product in this document before trying to install, operation, put into service or conduct the maintenance on it.

The correct functioning and lifespan of the product depend on respecting the installation, commissioning and exploitation instructions found in this manual. Geometry of the cable trough. Schneider Electric declines any responsibility for the following points: Altitude of the connecting points in relation to the cable flanges other than mounting fuokit.

Installation of the switchboard The positioning of the Functional Units is primordial for: For any assistance or advice, contact the Schneider Electric After-Sales department. Realign the passage on the front inner edge of the cable trough. Respect the imposed distances see chapter 5.

A direct exposure can lead to excessive overheating of the low voltage racks. Installing the Fluokjt Units to the floor. Installation of the frame. Preparation of the sections Two profile sections must be laid out, one at the rear and one at the front, in the lengthwise direction of the switchboard.

  8155 INTERFACING PDF

Access to the substation Substation access must remain free at all times and under any circumstances. Pouring the cement top coat.

The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders. Make up a frame composed of two profile sections, laid out, one at the rear and one at the front, in the lengthwise direction of the switchboard.

Compliance with this indication is compulsory, non compliance with this stipulation may damage the equipment. Position and adjust the rails in height by acting on the adjusting nuts.

This user manual does not list the locking-out procedures that must be applied. These are carried out by Schneider Electric or by a specialised technician, trained by Schneider Electric in the implementation of procedures, and who is equipped with specific equipment.

U section 32x20x2 2. Examples of the installation of Functional Units with internal arc deflectors. M12x30 hook bolt 8. The dressing of a top coat of cement using a rule should eliminate any surface irregularities greater than 2 mm per metre. Pouring the cement top coat On the un-surfaced exposed concrete, pour a top coat of smooth finish, without ballast.

FLUOKIT M+ 24kV | Schneider Electric

Certain passages must be sufficient for free movement and execution of operation and maintenance manoeuvres, – leave the room’s access door free, fpuokit take all measures to prevent all incidence of climatic conditions humidity, pollution, etc. Switchboard back-to-back against a wall or not, with internal arc withstand.

Fit shims below the sections 1 and 2 to set their level. The durations for completing the operations mentioned given in the maintenance tables are purely an indication and depend on on-site conditions. Installation of the switchboard at height, on a frame. Reserve opening at the extremity of each rail. Browse services Field Services Optimize the life cycle of your assets, improve performance, safety, k24 reduce maintenance costs — all with an experienced provider of complete field services and a partner you can trust.

  COMPLEJO DE INFERIORIDAD ADLER PDF

Access to the substation. Reserve opening for connecting the earthing cable.

Protection equipments Only qualified and accredited people can operate on our products. Local requirements especially about safety and which vluokit in accordance with the indications given in this document, must be observed.

Secondary Air Insulated Switchgear.

Do not do it! Complete this assembly by the lateral irons. Nevertheless, if the room’s architecture does not permit this type of installation, other options exist in order to meet the requirements of Standard IEC FLR rear access, internal arcing etc. Browse our resource section and find gluokit most useful tools and documents for all our products Browse Energy and sustainability services First, envision an energy-efficient, cost-effective and sustainable enterprise.

Fluokit M24+ – Schneider Electric

Schneider Electric, the Schneider Electric logo and their figurative forms are Schneider Electric registered trademarks. The switchboard must not be exposed to any solar radiation. Each profile section comprises, every mm, fluoklt fixing plate welded and drilled with 2 holes of Passages must be designed to permit easy maintenance for all of the substation’s elements circuit breaker, transformer, etc.

Painted sheet steel 2 mm thick. They must be equipped with all the correct protective equipment required for the task being performed.

ECOFIT Fluokit M24/FP

Local safety requirements which are in accordance with these instructions, especially those regarding the safety of product operators and other site workers, must be observed. Advice that is appropriate for the various types of cable troughs. The durations for completing the operations mentioned given in the maintenance tables are purely an indication and depend on on-site conditions.